<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>City of Racine - File #: 0673-23</title><link>https://cityofracine.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6280470&amp;GUID=6215FF0D-AE16-46BD-99D5-36E05118AC62</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://cityofracine.legistar.com/Feed.ashx?GUID=6215FF0D-AE16-46BD-99D5-36E05118AC62&amp;ID=6280470&amp;M=LD" rel="self" type="application/atom+xml" /><item><title>City of Racine - File #: 0673-23</title><link>https://cityofracine.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6280470&amp;GUID=6215FF0D-AE16-46BD-99D5-36E05118AC62</link><guid isPermaLink="false">6215FF0D-AE16-46BD-99D5-36E05118AC62-2024-06-13-22-19-15</guid><description>Title: Subject: Communication sponsored by Alder West, on behalf of the Transit &amp; Mobility Director, requesting permission to enter into a Guaranteed Energy Savings Agreement with McKinstry Essention, LLC for the purpose of final design, implementation and measure and verification of a solar array at 1900 Kentucky Street transit facility and energy-savings improvements.

Recommendation of the Finance and Personnel Committee on 07-10-2023: That the Mayor and City Clerk be granted permission to enter into a Guaranteed Energy Savings Agreement with McKinstry Essention, LLC for the purpose of final design, implementation and measure and verification of a solar array at 1900 Kentucky Street transit facility and energy-savings improvements.

Fiscal Note: Total turnkey project cost amounts to $2,599,673, which includes previously appropriated Investment Grade Audit, final design, implementation and measure and verification funded through United States Department of Energy and ARPA energy funds.  Congressionally Directed Spending requires a minimum of 50% in local match. Staff recommends utiliz</description><pubDate>Thu, 13 Jun 2024 22:19:15 GMT</pubDate></item></channel></rss>