<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>City of Racine - File #: Res.15-0397</title><link>https://cityofracine.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=2499937&amp;GUID=F34B51A3-0783-4671-B023-850CAC9D066E</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://cityofracine.legistar.com/Feed.ashx?GUID=F34B51A3-0783-4671-B023-850CAC9D066E&amp;ID=2499937&amp;M=LD" rel="self" type="application/atom+xml" /><item><title>City of Racine - File #: Res.15-0397</title><link>https://cityofracine.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=2499937&amp;GUID=F34B51A3-0783-4671-B023-850CAC9D066E</link><guid isPermaLink="false">F34B51A3-0783-4671-B023-850CAC9D066E-2015-11-04-16-30-53</guid><description>Title: Replace Transmission Tower at 2200 Oakes Road

Resolved, that the request by Robert Bokowski, representing WE Energies, to replace an existing 200-foot tall transmission tower with a 230-foot tall transmission tower, with associated equipment at 2200 Oakes Road is approved, subject to the following conditions:

a. That the plans presented to the Plan Commission on October 14, 2015, be approved subject to the conditions contained herein.

b. That all applicable building and occupancy permits be obtained from the Building Inspection Department.

c. That all codes and ordinances be complied with and required permits acquired.

d. That the structural analysis shall be submitted for review and approval prior to the issuance of building permits.

e. That the existing lease area for the tower shall remain the same and contain all equipment for the transmission tower and wireless communication facilities.

f. That any request to expand the lease area, or construct any additional base equipment facilities / structures, shall require review and approval by the Plan Commission.
</description><pubDate>Wed, 04 Nov 2015 16:30:53 GMT</pubDate></item></channel></rss>