Ricine Banner
File #: Res.0134-16    Version: A Name: 2016 Get Lei'd 5K Run/Walk
Type: Resolution Status: Passed
File created: 4/18/2016 In control: City Attorney's Office
On agenda: 4/18/2016 Final action: 4/18/2016
Title: 2016 Get Lei'd 5K Run/Walk Resolved, that the request of Tristin Erickson (5K Events) to use City right-of-way on July 23, 2016, for the Get Lei’d 5K Run/Walk event is granted permission with the following stipulations: A. A hold harmless agreement be executed and a $75.00 processing fee paid. B. A liability insurance certificate be filed prior to this event. C. Any overtime costs incurred by any City department be charged to the sponsor. D. The sponsor shall notify all abutting property owners seventy-two (72) hours in advance of this event. E. If required, sponsor shall be responsible for submitting a Temporary Traffic Control Plan to the Engineering Department for approval, and providing and removing all temporary traffic control devices and detour signs. F. If required, sponsor shall provide a detour plan for the closure of all State Connecting Highways, arterial and collector streets to the City Engineer for approval. G. Sponsor is responsible for cleaning the streets. H....
Sponsors: James Morgenroth
Related files: 0240-16

Sponsor

Alderman Morgenroth

 

Title

2016 Get Lei'd 5K Run/Walk

 

Resolved, that the request of Tristin Erickson (5K Events) to use City right-of-way on July 23, 2016, for the Get Lei’d 5K Run/Walk event is granted permission with the following stipulations:

 

A. A hold harmless agreement be executed and a $75.00 processing fee paid.

 

B. A liability insurance certificate be filed prior to this event.

 

C. Any overtime costs incurred by any City department be charged to the sponsor.

 

D. The sponsor shall notify all abutting property owners seventy-two (72) hours in advance of this event.

 

E. If required, sponsor shall be responsible for submitting a Temporary Traffic Control Plan to the Engineering Department for approval, and providing and removing all temporary traffic control devices and detour signs.

 

F. If required, sponsor shall provide a detour plan for the closure of all State Connecting Highways, arterial and collector streets to the City Engineer for approval.

 

G. Sponsor is responsible for cleaning the streets.

 

H. If required, sponsor shall install parking meter hoods or temporary parking signs at least twenty-four (24) hours in advance of the event, and if this is not done, sponsor is responsible for vehicle towing and parking violation expenses of the violators.

 

Further resolved, that the Commissioner of Public Works, City Engineer and Chief of Police provide limited assistance, in the interest of public safety, to implement this event.

 

Fiscal Note: There will be nominal costs to various City departments, on a regular shift basis, to assist in implementing this event.