Ricine Banner
File #: 08-2208    Version: A Name: Agreement for the Design of the Colonial Park Streambank Stabilization.
Type: Communication Status: Passed
File created: 5/21/2008 In control: Public Works and Services Committee
On agenda: Final action: 6/3/2008
Title: Subject: (Direct Referral) Communication from the Assistant Commissioner of Public Works/Engineering submitting an agreement for the Design of the Colonial Park Streambank Stabilization. (Res.08-0847) Recommendation: That the Commissioner of Public Works/City Engineer be authorized and directed to enter into a Professional Services Agreement for Design of Colonial Park Root River Stabilization, on behalf of the City of Racine, with the Wisconsin Department of Natural Resources and Earth Tech, Inc., in the not-to-exceed amount of $23,000.00, which is funded 60% by the State of Wisconsin, or $13,800.00, and 40% by the City of Racine, or $9,200.00. Further recommends that funds to defray the cost of these professional services are available in Account 104.900.5420, Replacement Storm Sewer Construction. Fiscal Note: Funds are available as herein delineated.
Related files: Res.08-0847
Title
Subject: (Direct Referral)  Communication from the Assistant Commissioner of Public Works/Engineering submitting an agreement for the Design of the Colonial Park Streambank Stabilization.  (Res.08-0847)
 
Recommendation: That the Commissioner of Public Works/City Engineer be authorized and directed to enter into a Professional Services Agreement for Design of Colonial Park Root River Stabilization, on behalf of the City of Racine, with the Wisconsin Department of Natural Resources and Earth Tech, Inc., in the not-to-exceed amount of $23,000.00, which is funded 60% by the State of Wisconsin, or $13,800.00, and 40% by the City of Racine, or $9,200.00.
 
Further recommends that funds to defray the cost of these professional services are available in Account 104.900.5420, Replacement Storm Sewer Construction.
 
Fiscal Note: Funds are available as herein delineated.