Ricine Banner
File #: Res.15-0418    Version: A Name: 2016 St. John's Lutheran School Spirit Run
Type: Resolution Status: Passed
File created: 11/17/2015 In control: City Attorney's Office
On agenda: 11/17/2015 Final action: 11/17/2015
Title: 2016 St. John's Lutheran School Spirit Run Resolved, that St. John's Lutheran School is granted permission to use City right-of-way for a run/walk on Saturday, September 17, 2016. Further resolved, that permission be granted with the following stipulations: A. A hold harmless agreement be executed and a $75 processing fee paid. B. A liability insurance certificate be filed prior to this event. C. Any overtime costs incurred by any City department are charged to the sponsor. D. The sponsor shall notify all abutting property owners seventy-two (72) hours in advance of this event. E. If required, sponsor shall be responsible for submitting a Temporary Traffic Control Plan to the Engineering Department for approval, and providing and removing all temporary traffic control devices and detour signs. F. If required, sponsor shall provide a detour plan for the closure of all State connecting highways, arterial and collector streets to the City Engineer for approval. G. Sponsor is r...
Sponsors: James Morgenroth
Related files: 15-00961

Sponsor

Alderman Morgenroth

 

Title

2016  St. John's Lutheran School Spirit Run

 

Resolved, that St. John's Lutheran School is granted permission to use City right-of-way for a run/walk on Saturday, September 17, 2016.

 

Further resolved, that permission be granted with the following stipulations:

 

A. A hold harmless agreement be executed and a $75 processing fee paid.

 

B. A liability insurance certificate be filed prior to this event.

 

C. Any overtime costs incurred by any City department are charged to the sponsor.

 

D. The sponsor shall notify all abutting property owners seventy-two (72) hours in advance of this event.

 

E. If required, sponsor shall be responsible for submitting a Temporary Traffic Control Plan to the Engineering Department for approval, and providing and removing all temporary traffic control devices and detour signs.

 

F. If required, sponsor shall provide a detour plan for the closure of all State connecting highways, arterial and collector streets to the City Engineer for approval.

 

G. Sponsor is responsible for cleaning the streets.

 

H. If required, sponsor shall install parking meter hoods or temporary parking signs at least twenty-four (24) hours in advance of the event and if this is not done, sponsor is responsible for vehicle towing and parking violation expenses of the violators.

 

Further resolved, that the Commissioner of Public Works, City Engineer and Chief of Police provide limited assistance, in the interest of public safety, to implement this event.

 

Fiscal Note: There will be nominal costs to the various City departments, on a regular shift basis, to assist in implementing this event.