File #: 09-4265    Version: A Name: 2010 assessment rates for the 2011 construction of Portland cement concrete paving and curb and gutter replacement.
Type: Communication Status: Passed
File created: 10/7/2009 In control: Public Works and Services Committee
On agenda: Final action: 10/20/2009
Title: Subject: (Direct Referral) Communication from the Assistant Commissioner of Public Works/Engineering submitting the 2010 assessment rates for the 2011 construction of Portland cement concrete paving and curb and gutter replacement. (Res.09-1659) Recommendation of the Public Works and Services Committee on 10-13-09: The proposed special assessment rates for public hearings in 2010 (2011 construction) for portland cement concrete paving and curb and gutter be as follows: Portland Cement Concrete Paving Residential Paving (7 inch) - 26' Flange to Flange $57.00/Front Foot Residential Paving (7 inch) - 32' Flange to Flange $65.00/Front Foot Commercial Paving (8 inch) - 32' Flange to Flange $75.00/Front Foot Industrial Paving (9 inch) - 32' Flange to Flange $85.00/Front Foot Industrial Paving (9 inch) - 44' Flange to Flange $105.00/Front Foot Industrial Paving (9 inch doweled)-44' Flange to Flange $115.00/Front Foot Industrial Paving (10 inch doweled)-44' Flange to Flange $125...
Attachments: 1. 09-4265
Related files: Res.09-1659

Title

Subject: (Direct Referral)  Communication from the Assistant Commissioner of Public Works/Engineering submitting the 2010 assessment rates for the 2011 construction of Portland cement concrete paving and curb and gutter replacement.  (Res.09-1659)

 

Recommendation of the Public Works and Services Committee on 10-13-09: The proposed special assessment rates for public hearings in 2010 (2011 construction) for portland cement concrete paving and curb and gutter be as follows:

 

Portland Cement Concrete Paving

 

Residential Paving (7 inch) - 26' Flange to Flange                                           $57.00/Front Foot

Residential Paving (7 inch) - 32' Flange to Flange                                           $65.00/Front Foot

Commercial Paving (8 inch) - 32' Flange to Flange                                          $75.00/Front Foot

Industrial Paving (9 inch) - 32' Flange to Flange                                                               $85.00/Front Foot

Industrial Paving (9 inch) - 44' Flange to Flange                                                               $105.00/Front Foot

Industrial Paving (9 inch doweled)-44' Flange to Flange                                          $115.00/Front Foot

Industrial Paving (10 inch doweled)-44' Flange to Flange                     $125.00/Front Foot

 

Portland Cement Concrete Curb and Gutter (30 inch)

 

7" Pavement                                          $22.00/Front Foot

8" Pavement                                          $24.00/Front Foot

9" Pavement                                          $26.00/Front Foot

10" Pavement                     $28.00/Front Foot

 

Sewer and Water Services

 

Sewer (6”) and Water (1”)                                          $9,000.00/Each

Sewer (6”) and Water (2”)                                          $10,500.00/Each

 

Alley Paving

 

10’ ROW                                          7” Pavement                                          $30.00/Front Foot

11'-15' ROW                                          7” Pavement                                          $40.00/Front Foot

16’-20' ROW                                          7” Pavement                                          $50.00/Front Foot

21'-25' ROW                                          7” Pavement                                          $60.00/Front Foot

 

Further recommend that these special assessment rates become effective upon passage of the Common Council for all preliminary resolutions.

 

These rates apply to all streets, regardless of width, unless the actual construction cost is less, then the front foot cost shall be reduced accordingly.

 

Fiscal Note: These rates are established so that the abutting property owner pays 100% of the cost of such street improvements.