Ricine Banner
File #: Res.06-6958    Version: A Name: WAIVE BIDDING PROCEDURES FOR SAFETY BUILDING REPAIRS
Type: Resolution Status: Passed
File created: 4/5/2006 In control: City Attorney's Office
On agenda: Final action: 4/5/2006
Title: WAIVE BIDDING PROCEDURES FOR SAFETY BUILDING REPAIRS RESOLVED, that an emergency situation be declared in accordance with Wis. Stat. sec. 62.15(1)(b) and that formal bidding procedures be waived for emergency replacement of the chillers at the Safety Building. FURTHER RESOLVED, that the Commissioner of Public Works/City Engineer be authorized and directed to negotiate with Johnson Controls, Inc., Milwaukee, WI, for the replacement of this equipment. FISCAL NOTE: The cost of this emergency repair is estimated at $140,000.00 which, except for a $10,000.00 deductible, should be covered by the city's property insurance. Funds are available for the City's share of the cost of this repair.
Sponsors: John Engel

Sponsor

Alderman Engel

 

Title

WAIVE BIDDING PROCEDURES FOR SAFETY BUILDING REPAIRS

 

RESOLVED, that an emergency situation be declared in accordance with Wis. Stat. sec. 62.15(1)(b) and that formal bidding procedures be waived for emergency replacement of the chillers at the Safety Building.

 

FURTHER RESOLVED, that the Commissioner of Public Works/City Engineer be authorized and directed to negotiate with Johnson Controls, Inc., Milwaukee, WI, for the replacement of this equipment.

 

 

FISCAL NOTE:  The cost of this emergency repair is estimated at $140,000.00 which, except for a $10,000.00 deductible, should be covered by the city's property insurance. Funds are available for the City's share of the cost of this repair.