Ricine Banner
File #: Res.13-0206    Version: A Name: Washington Park Streambank Stabilization Project
Type: Resolution Status: Passed
File created: 5/21/2013 In control: City Attorney's Office
On agenda: Final action: 5/21/2013
Title: Washington Park Streambank Stabilization Project Resolved, that permission is granted for the Assistant Commissioner of Public Works/City Engineer to apply for the State of Wisconsin Urban Nonpoint Source & Storm Water (UNPS&SW) Program Construction Grant for the Washington Park Streambank Stabilization Project. (Grant Control No. 2013-010) Fiscal Note: The grant is 50% maximum of eligible costs; total project cost $300,000; $150,000 maximum State share and requires a City match of $150,000 which is included in the 2013 Storm Water Enterprise Fund.
Sponsors: Q.A. Shakoor II
Related files: 13-8835
Sponsor
Alderman Shakoor
 
Title
Washington Park Streambank Stabilization Project
 
Resolved, that permission is granted for the Assistant Commissioner of Public Works/City Engineer to apply for the State of Wisconsin Urban Nonpoint Source & Storm Water (UNPS&SW) Program Construction Grant for the Washington Park Streambank Stabilization Project. (Grant Control No. 2013-010)
 
Fiscal Note: The grant is 50% maximum of eligible costs; total project cost $300,000; $150,000 maximum State share and requires a City match of $150,000 which is included in the 2013 Storm Water Enterprise Fund.