Ricine Banner
File #: Res.13-0126    Version: A Name: Washington Park Streambank Stabilization Project
Type: Resolution Status: Passed
File created: 3/19/2013 In control: City Attorney's Office
On agenda: Final action: 3/19/2013
Title: Washington Park Streambank Stabilization Project Resolved, that permission is granted for the Assistant Commissioner of Public Works/City Engineer to accept and sign the grant agreement for a State of Wisconsin Urban Nonpoint Source & Storm Water (UNPS&SW) Construction Grant for the Washington Park Streambank Stabilization Project. (Grant Control No. 2012-009) Fiscal Note: The grant is 50% maximum of eligible costs; total project cost $300,000; $150,000 maximum State share. Requires a City match of $150,000. Funding is available in account 104.993.5440, Washington Park Streambank B.
Sponsors: Q.A. Shakoor II
Related files: 13-8722
Sponsor
Alderman Shakoor
 
Title
Washington Park Streambank Stabilization Project
 
Resolved, that permission is granted for the Assistant Commissioner of Public Works/City Engineer to accept and sign the grant agreement for a State of Wisconsin Urban Nonpoint Source & Storm Water (UNPS&SW) Construction Grant for the Washington Park Streambank Stabilization Project. (Grant Control No. 2012-009)
 
Fiscal Note: The grant is 50% maximum of eligible costs; total project cost $300,000; $150,000 maximum State share. Requires a City match of $150,000. Funding is available in account 104.993.5440, Washington Park Streambank B.