Title:
|
Waive formal bidding for repairs to Main Street Bridge
Resolved, that due to the specialized nature of the repairs to the Main Street Bridge tip lock, formal bidding procedures be waived and that the Purchasing Agent by authorized and directed to negotiate with RACO International, L.P. for repairs to the tip lock which is estimated at $28,500.00.
Fiscal Note: All costs associated with the Main Street Bridge are 100% reimbursable by the State of Wisconsin.
|