File #: Res.10-1834    Version: A Name: Permission granted to Racine Water Utility to close Washington Avenue during 2010 construction season for reconstruction of water transmission main and Commissioner of Public Works submit notice of permit to Wisconsin DOT for street closure
Type: Resolution Status: Passed
File created: 2/2/2010 In control: City Attorney's Office
On agenda: Final action: 2/2/2010
Title: Permission granted to Racine Water Utility to close Washington Avenue during 2010 construction season for reconstruction of water transmission main and Commissioner of Public Works submit notice of permit to Wisconsin DOT for street closure Resolved, that permission be granted to the Racine Water Utility to close Washington Avenue from 9th Street to Center Street for the reconstruction of a water transmission main during the 2010 construction season with the stipulation that the Water Utility provide and maintain all barricades and signage necessary to detour the State highway route. Further resolved, that the Commissioner of Public Works/City Engineer be authorized and directed to submit to the Wisconsin Department of Transportation a notice of permit for the closure of this roadway. Fiscal Note: There will be no cost to the City of Racine. All costs will be paid for by the Racine Water Utility.
Sponsors: Gregory Helding
Related files: 10-4634

Sponsor

Alderman Helding

 

Title

Permission granted to Racine Water Utility to close Washington Avenue during 2010 construction season for reconstruction of water transmission main and Commissioner of Public Works submit notice of permit to Wisconsin DOT for street closure

 

Resolved, that permission be granted to the Racine Water Utility to close Washington Avenue from 9th Street to Center Street for the reconstruction of a water transmission main during the 2010 construction season with the stipulation that the Water Utility provide and maintain all barricades and signage necessary to detour the State highway route.

 

Further resolved, that the Commissioner of Public Works/City Engineer be authorized and directed to submit to the Wisconsin Department of Transportation a notice of permit for the closure of this roadway.

 

Fiscal Note: There will be no cost to the City of Racine. All costs will be paid for by the Racine Water Utility.