File #: Res.08-1167    Version: A Name: 2009 Assessment Rates for the 2010 construction of Portland cement concrete paving and curb and gutter replacement
Type: Resolution Status: Passed
File created: 12/16/2008 In control: City Attorney's Office
On agenda: Final action: 12/16/2008
Title: 2009 Assessment Rates for the 2010 construction of Portland cement concrete paving and curb and gutter replacement Resolved, that the proposed special assessment rates for public hearings in 2009 (2010 construction) for portland cement concrete paving and curb and gutter be as follows: Portland Cement Concrete Paving Residential Paving (7 inch) - 26' Flange to Flange $52.00/Front Foot Residential Paving (7 inch) - 32' Flange to Flange $57.00/Front Foot Commercial Paving (8 inch) - 32' Flange to Flange $65.00/Front Foot Industrial Paving (9 inch) - 32' Flange to Flange $77.00/Front Foot Industrial Paving (9 inch) - 44' Flange to Flange $97.00/Front Foot Industrial Paving (9 inch doweled) - 44' Flange to Flange $105.00/Front Foot Industrial Paving (10 inch doweled) - 44' Flange to Flange $115.00/Front Foot Portland Cement Concrete Curb and Gutter (30 inch) 7" Pavement $18.00/Front Foot 8" Pavement $19.00/Front Foot 9" Pavement $20.00/Front Foot 10" Pavement $21.00...
Sponsors: Gregory Helding
Related files: 08-2984

Sponsor

Alderman Helding

 

Title

2009 Assessment Rates for the 2010 construction of Portland cement concrete paving and curb and gutter replacement

 

Resolved, that the proposed special assessment rates for public hearings in 2009 (2010 construction) for portland cement concrete paving and curb and gutter be as follows:

 

Portland Cement Concrete Paving

 

Residential Paving (7 inch) - 26' Flange to Flange                                                                $52.00/Front Foot

Residential Paving (7 inch) - 32' Flange to Flange                                                                $57.00/Front Foot

Commercial Paving (8 inch)  - 32' Flange to Flange                                                               $65.00/Front Foot

Industrial Paving (9 inch) - 32' Flange to Flange                                                                                    $77.00/Front Foot

Industrial Paving (9 inch) - 44' Flange to Flange                                                                                    $97.00/Front Foot

Industrial Paving (9 inch doweled) - 44' Flange to Flange                     $105.00/Front Foot

Industrial Paving (10 inch doweled) - 44' Flange to Flange                     $115.00/Front Foot

 

Portland Cement Concrete Curb and Gutter (30 inch)

 

7" Pavement                                          $18.00/Front Foot

8" Pavement                                          $19.00/Front Foot

9" Pavement                                          $20.00/Front Foot

10" Pavement                                          $21.00/Front Foot

 

Sewer and Water Services

 

Sewer (6”) and Water (2”)                                          $10,500.00/Each

 

Alley Paving

15’ ROW                     7” Pavement                                          $31.00/Front Foot

25’ ROW                     7” Pavement                                          $52.00/Front Foot

 

Further resolved, that these special assessment rates become effective upon passage of the Common Council for all preliminary resolutions.

 

These rates apply to all streets, regardless of width, unless the actual construction cost is less, then the front foot cost shall be reduced accordingly.

 

Fiscal Note: These rates are established so that the abutting property owner pays 100% of the cost of such street improvements.