Sponsor
Alderman Helding
Title
Design Option 3 for Victorian Drive Storm Water Drainage
Resolved, that Design Option 3 for Victorian Drive Storm Water Drainage problems be approved as presented.
Fiscal Note: Design Option 3 is estimated at $149,800.00 and funds are available in the Storm Water Utility Account, 104.900.5420.