Title:
|
Subject: Communication from the Assistant Commissioner of Public Works/Engineering requesting permission to apply for a $112,000 grant with the Wisconsin Waterways Commission (Grant Control No. 2006-051) to be utilized for the installation of a floating dock on the north side of the Root River, west of the Main Street Bridge.
Recommendation of the Finance & Personnel Committee on 12-11-06: Permission granted for the Assistant Commissioner of Public Works/Engineering apply for a $112,000 grant with the Wisconsin Waterways Commission (Grant Control No. 2006-051) to be utilized for the installation of a floating dock on the north side of the Root River, west of the Main Street Bridge.
Fiscal Note: Total project cost will be $140,000 with the City’s hard cash match at 20% or $28,000. The City’s match will be budgeted for in 2008 Capital Improvements.
|