Ricine Banner
File #: 09-3143    Version: A Name: Request to store equipment and materials at the former Walker site in conjunction with a Caledonia Force Main Repair project on Michigan Boulevard.
Type: Communication Status: Passed
File created: 1/21/2009 In control: Public Works and Services Committee
On agenda: Final action: 2/3/2009
Title: Subject: (Direct Referral) Communication from Visu-Sewer, Inc. requesting permission to store equipment and materials at the former Walker site in conjunction with a Caledonia Force Main Repair project on Michigan Boulevard. (Res.09-1216) Recommendation of the Public Works and Services Committee on 1-27-09: The Mayor and City Clerk be authorized and directed to enter into an agreement with Visu-Sewer, Inc. for the use of the Walker Site for the storage of construction materials for the Caledonia Force Main Repair-Michigan Boulevard project, from February 4, 2009 to June 1, 2009, with the following stipulations: A. A Hold Harmless Agreement be executed; B. A Liability Insurance Certificate be filed; and C. Visu-Sewer, Inc. restores the property to its original condition. Fiscal Note: Not applicable.
Attachments: 1. Visu-Sewer.pdf
Related files: Res.09-1216
Title
Subject: (Direct Referral) Communication from Visu-Sewer, Inc. requesting permission to store equipment and materials at the former Walker site in conjunction with a Caledonia Force Main Repair project on Michigan Boulevard.  (Res.09-1216)
 
Recommendation of the Public Works and Services Committee on 1-27-09: The Mayor and City Clerk be authorized and directed to enter into an agreement with Visu-Sewer, Inc. for the use of the Walker Site for the storage of construction materials for the Caledonia Force Main Repair-Michigan Boulevard project, from February 4, 2009 to June 1, 2009, with the following stipulations:
 
A. A Hold Harmless Agreement be executed;
B. A Liability Insurance Certificate be filed; and
C. Visu-Sewer, Inc. restores the property to its original condition.
 
Fiscal Note: Not applicable.