Title:
|
Permission to accept $70,000 from Wisconsin Waterways Commission for installation of a floating dock
Resolved, that the Asst. Commissioner of Public Works/Engineering be authorized to accept $70,000 from the Wisconsin Waterways Commission to be utilized for the installation of a floating dock on the north side of the Root River, west of the Main Street Bridge and request the local match be increased from $28,000 to $70,000 in the 2008 budget year. (Grant Control No. 2006-051).
Further resolved, that the general fund advance up to $40,000, interest free, to be paid back in even installments over the next 10 years.
Fiscal Note: Local match will be increased from $28,000 to $70,000 in the 2008 budget year. The increase will be funded through existing Harbor Commission funds and an advance from the General Fund.
|