Title: Submitting assessment rates established for 2012 Public Hearings for 2013 construction of Portland Cement Concrete Paving and Curb and Gutter. Resolved, that the proposed special assessment rates for public hearings in 2012 (2013 construction) for portland cement concrete paving and curb and gutter be as follows: Portland Cement Concrete Paving Residential Paving (7 inch) - 26' Flange to Flange $57.00/Front Foot Residential Paving (7 inch) - 32' Flange to Flange $65.00/Front Foot Commercial Paving (8 inch) - 32' Flange to Flange $75.00/Front Foot Industrial Paving (9 inch) - 32' Flange to Flange $85.00/Front Foot Industrial Paving (9 inch) - 44' Flange to Flange $105.00/Front Foot Industrial Paving (9 inch doweled)-44' Flange to Flange $115.00/Front Foot Industrial Paving (10 inch doweled)-44' Flange to Flange $125.00/Front Foot Portland Cement Concrete Curb and Gutter (30 inch) 7" Pavement $22.00/Front Foot 8" Pavement $24.00/Front Foot 9" Pavement $26.00/Front Foot 10" Pavement $...
Sponsors: Sandy Weidner
Related files: 11-6885
Sponsor
Alderman Weidner
 
Title
Submitting assessment rates established for 2012 Public Hearings for 2013 construction of Portland Cement Concrete Paving and Curb and Gutter.
 
Resolved, that the proposed special assessment rates for public hearings in 2012 (2013 construction) for portland cement concrete paving and curb and gutter be as follows:
 
Portland Cement Concrete Paving
Residential Paving (7 inch) - 26' Flange to Flange $57.00/Front Foot
Residential Paving (7 inch) - 32' Flange to Flange $65.00/Front Foot
Commercial Paving (8 inch) - 32' Flange to Flange $75.00/Front Foot
Industrial Paving (9 inch) - 32' Flange to Flange $85.00/Front Foot
Industrial Paving (9 inch) - 44' Flange to Flange $105.00/Front Foot
Industrial Paving (9 inch doweled)-44' Flange to Flange $115.00/Front Foot
Industrial Paving (10 inch doweled)-44' Flange to Flange $125.00/Front Foot
 
Portland Cement Concrete Curb and Gutter (30 inch)
7" Pavement $22.00/Front Foot
8" Pavement $24.00/Front Foot
9" Pavement $26.00/Front Foot
10" Pavement $28.00/Front Foot
 
Sewer and Water Services
Sewer (6") and Water (1") $10,500.00/Each
Sewer (6") and Water (2") $12,000.00/Each
 
Alley Paving
10' ROW 7" Pavement $35.00/Front Foot
11'-15' ROW 7" Pavement $45.00/Front Foot
16'-20' ROW 7" Pavement $55.00/Front Foot
21'-25' ROW 7" Pavement $65.00/Front Foot
 
Further resolved, that these special assessment rates become effective upon passage of the Common Council for all preliminary resolutions.
 
These rates apply to all streets, regardless of width, unless the actual construction cost is less, then the front foot cost shall be reduced accordingly.
 
Fiscal Note: These rates are established so that the abutting property owner pays 100% of the cost of such street improvements.