Title
Subject: (Direct Referral) Communication from the Assistant Commissioner of Public Works/City Engineer submitting a list of streets to be included in the 2017 Public Hearings for 2018 Construction. (Res No. 0011-17)
Recommendation of the Public Works and Services Committee on 01-10-17: That the following list of streets, as submitted by the Assistant Commissioner of Public Works/City Engineer, be considered for reconstruction with Portland Cement Concrete Paving or Bituminous Concrete Paving for the 2018 construction season (2017 public hearings) and that a preliminary resolution be introduced.
Portland Concrete Paving
Eaton Lane - Rapids Drive to Cul-de-sac
Winthrop Avenue - Carpenter Avenue to Hamlin Avenue
Indiana Street - Taylor Avenue to Maryland Avenue
Emstan Hills Road - Duchess Drive to Oakwood Drive
Wood Duck Way - Waterbury Lane to Chicory Road
Belmont Avenue - Eisenhower Drive to Spring Street
Cleveland Avenue - Durand Avenue to Pierce Boulevard
Echo Lane - Byrd Avenue to Sixteenth Street
Freeland Circle - Virginia Street to Cul-de-sac
Kentucky Street - Cul-de-sac to Shadow Lane
Indiana Street - Durand Avenue to Pierce Boulevard
Olive Street - Illinois Street to Oregon Street
Olive Street - Kentucky Street to Orchard Street
Olive Street - Oregon Street to Indiana Street
Olive Street - Virginia Street to Illinois Street
Roosevelt Avenue - Cul-de-sac to Byrd Avenue
Thunderbird Drive - 60 Ft. East of Dead End to Marquette Drive
Webster Street - Ashland Avenue to Kearney Avenue
Bituminous Concrete Paving
Eaton Lane - Rapids Drive to Cul-de-sac
Winthrop Avenue - Carpenter Avenue to Hamlin Avenue
Indiana Street - Taylor Avenue to Maryland Avenue
Emstan Hills Road - Duchess Drive to Oakwood Drive
Wood Duck Way - Waterbury Lane to Chicory Road
Belmont Avenue - Eisenhower Drive to Spring Street
Cleveland Avenue - Durand Avenue to Pierce Boulevard
Echo Lane - Byrd Avenue to Sixteenth Street
Freeland Circle - Virginia Street to Cul-de-sac
Kentucky Str...