Ricine Banner
File #: Res.15-0216    Version: A Name: 2015 Monument Square Art Fair
Type: Resolution Status: Passed
File created: 5/19/2015 In control: City Attorney's Office
On agenda: Final action: 5/19/2015
Title: 2015 Monument Square Art Fair Resolved, that Art Metals Studio is granted permission to close 5th Street for the Monument Square Art Fair, on Friday, May 29, 2015 until Sunday, May 31, 2015 for the Monument Square Art Fair, with the following stipulations: A. A hold harmless agreement be executed and a $75.00 processing fee paid. B. A liability insurance certificate be filed prior to this event. C. Any overtime costs incurred by any City department be charged to the sponsor. D. The sponsor shall notify all abutting property owners seventy-two (72) hours in advance of this event. E. The sponsor shall pay a $250.00 special event fee. F. If required, sponsor shall be responsible for submitting a Temporary Traffic Control Plan to the Engineering Department for approval, and providing and removing all temporary traffic control devices and detour signs. G. If required, sponsor shall provide a detour plan for the closure of all State Connecting Highways, arterial and collector streets...
Sponsors: James Morgenroth
Related files: 15-00457
Sponsor
Alderman Morgenroth
 
Title
2015 Monument Square Art Fair
 
Resolved, that Art Metals Studio is granted permission to close 5th Street for the Monument Square Art Fair, on Friday, May 29, 2015 until Sunday, May 31, 2015 for the Monument Square Art Fair, with the following stipulations:
 
A. A hold harmless agreement be executed and a $75.00 processing fee paid.
 
B. A liability insurance certificate be filed prior to this event.
 
C. Any overtime costs incurred by any City department be charged to the sponsor.
 
D. The sponsor shall notify all abutting property owners seventy-two (72) hours in advance of this event.
 
E. The sponsor shall pay a $250.00 special event fee.
 
F. If required, sponsor shall be responsible for submitting a Temporary Traffic Control Plan to the Engineering Department for approval, and providing and removing all temporary traffic control devices and detour signs.
 
G. If required, sponsor shall provide a detour plan for the closure of all State Connecting Highways, arterial and collector streets to the City Engineer for approval.
 
H. Sponsor is responsible for cleaning the streets.
 
I. If required, sponsor shall install parking meter hoods or temporary parking signs at least twenty-four (24) hours in advance of the event and if this is not done, sponsor is responsible for vehicle towing and parking violation expenses of the violators.
 
Further resolved, that the Commissioner of Public Works, City Engineer and Chief of Police provide limited assistance, in the interest of public safety, to implement this event.
 
Fiscal Note: There will be nominal costs to various City departments, on a regular shift basis, to assist in implementing this event.