Ricine Banner
File #: Res.15-0336    Version: A Name: 2015 Biggest Loser Run/Walk
Type: Resolution Status: Passed
File created: 9/1/2015 In control: City Attorney's Office
On agenda: 9/1/2015 Final action: 9/1/2015
Title: 2015 Biggest Loser Run/Walk Resolved, that Fit World Group, LLC. is granted permission to close the following streets and to utilize certain other City streets, as indicated on their race map, for The Biggest Loser Run/Walk on September 13, 2015 from 5:00 a.m. to 4:00 p.m. Hoffert Dr. from Barker St. to Michigan Blvd. Main St. from Gaslight Dr. to Dodge St. Further resolved, that the Commissioner of Public Works is authorized and directed to communicate with the U.S. Coast Guard requesting permission to close Main Street Bridge to boat traffic for the period of 7:30 a.m. to 1:00 p.m. on September 13, 2015, to satisfy the needs of this run. Further resolved, that permission is granted with the following stipulations: A. A hold harmless agreement be executed and a $75.00 processing fee paid. B. A liability insurance certificate be filed prior to this event. C. Any overtime costs incurred by any City department be charged to the sponsor. D. The sponsor shall notify all abutting pr...
Sponsors: James Morgenroth
Related files: 15-00714
Sponsor
Alderman Morgenroth

Title
2015 Biggest Loser Run/Walk

Resolved, that Fit World Group, LLC. is granted permission to close the following streets and to utilize certain other City streets, as indicated on their race map, for The Biggest Loser Run/Walk on September 13, 2015 from 5:00 a.m. to 4:00 p.m.

Hoffert Dr. from Barker St. to Michigan Blvd.
Main St. from Gaslight Dr. to Dodge St.

Further resolved, that the Commissioner of Public Works is authorized and directed to communicate with the U.S. Coast Guard requesting permission to close Main Street Bridge to boat traffic for the period of 7:30 a.m. to 1:00 p.m. on September 13, 2015, to satisfy the needs of this run.

Further resolved, that permission is granted with the following stipulations:

A. A hold harmless agreement be executed and a $75.00 processing fee paid.

B. A liability insurance certificate be filed prior to this event.

C. Any overtime costs incurred by any City department be charged to the sponsor.

D. The sponsor shall notify all abutting property owners seventy-two (72) hours in advance of the event.

E. The sponsor shall pay a $300.00 special event fee.

F. If required, sponsor shall be responsible for submitting a Temporary Traffic Control Plan to the Engineering Department for approval, and providing and removing all temporary traffic control devices and detour signs.

G. If required, sponsor shall provide a detour plan for the closure of all State connecting highways, arterial and collector streets to the City Engineer for approval.

H. Sponsor is responsible for cleaning the streets.

I. If required, sponsor shall install parking meter hoods or temporary parking signs at least twenty-four (24) hours in advance of the event and if this is not done, sponsor is responsible for vehicle towing and parking violation expenses of the violators.

Further resolved, that the Commissioner of Public Works, City Engineer and Chief of Police provide limited assistance, in the interest of publ...

Click here for full text