14-9968
| A | 1. | Communication from the President of Fourth Fest of Greater Racine requesting permission to use city right-of-way for the 4th of July parade and permission to use North Beach for the fireworks. (Res. No. 14-0237) | Communication | Subject: Communication from the President of Fourth Fest of Greater Racine requesting permission to use city right-of-way for the 4th of July parade and permission to use North Beach for the fireworks. (Res. No. 14-0237)
Recommendation of the Public Works and Services Committee on 04-08-14: That permission be granted to Fourth Fest of Greater Racine, Inc. to close certain city streets on Friday, July 4, 2014, from 7:00 A.M. to 12:30 P.M., to hold the 2014 Independence Day Parade.
Further recommends that in the interest of public safety, the Commissioner of Public Works, City Engineer and Chief of Police be authorized and directed to close Goold Street, Yout Street, English Street, High Street, St. Patrick Street, Kewaunee Street and Barker Street, from Main Street to Michigan Boulevard; Michigan Boulevard, from Goold Street to Hamilton Street; Chatham Street, from north of Yout Street to Hamilton Street; and Hoffert Drive, on Friday, July 4, 2014, to provide for a Municipal Band Concert, to be held at North Beach Gazebo, and the fireworks display, as part of the Independence D | Recommended For Approval | |
Action details
|
Not available
|
14-9973
| A | 2. | Communication from the Rotary Club of Downtown Racine requesting street closures, the use of Lakefront Lot No. 4/Festival Hall Lot, and the Civic Centre Parking Ramp for Post Prom 2014. (Res. No. 14-0156) | Communication | Subject: (Direct Referral) Communication from the Rotary Club of Downtown Racine requesting street closures, the use of Lakefront Lot No. 4/Festival Hall Lot, and the Civic Centre Parking Ramp for Post Prom 2014. (Res. No. 14-0156)
Recommendation of the Public Works and Services Committee on 04-08-14: That the request of the Rotary Post Prom Committee of the Downtown Rotary Club, to close:
Fifth Street from Lake Avenue to Festival Park Drive.
Festival Park Drive from Fifth Street to Sixth Street.
Sixth Street from Festival Park Drive to Pershing Park Drive.
Pershing Park Drive from Sixth Street to Eleventh Street.
Eleventh Street from Pershing Park Drive to Main Street.
from 7:00 P.M., Saturday May 17, 2014, to 4:30 A.M. Sunday, May 18, 2014, for the Rotary Post Prom, be approved.
Further resolved, that permission be granted with the following stipulations:
A. A hold harmless agreement be executed and a $75.00 processing fee paid.
B. Proof of liability insurance be filed prior to the event.
C. The setup and dismantling of barricades will be the responsibility | Recommended For Approval | |
Action details
|
Not available
|
14-9999
| A | 3. | Communication from Dave Blank, President of Real Racine, requesting to use City right-of-way on, Sunday, June 29, 2014, for the new national race "The Totally Rad '80's Run". (Res. No. 14-0157) | Communication | Subject: (Direct Referral) Communication from Dave Blank, President of Real Racine, requesting to use City right-of-way on, Sunday, June 29, 2014, for the new national race "The Totally Rad '80's Run". (Res. No. 14-0157)
Recommendation of the Public Works and Services Committee on 04-08-14: That permission be granted to Real Racine to close the following streets and to utilize certain other city streets, as indicated, on their race map, for "The Totally Rad '80's Run" on Sunday, June 29, 2014.
Pershing Park Drive from 6th Street to 11th Street
11th Street from Main Street to Pershing Park Drive
Main Street from 10th Street to 11th Street
10th Street from Main Street to Lake Avenue
Lake Avenue from 10th Street to State Street
6th Street from Pershing Park Drive to Center Street
7th Street from lake Avenue to Center Street
Main Street from 7th Street to Main Street Bridge
Gaslight Drive from Lake Avenue to cul-de-sac
2nd Street from Main Street to Wisconsin Avenue
Wisconsin Avenue from 2nd Street to 3rd Street
3rd Street from Wisconsin Avenue to Main Street
with | Recommended For Approval | |
Action details
|
Not available
|
14-9990
| A | 4. | Bid results on Contract 07-14 (K4-007), 2014 CDBG Concrete Reconstruct. (Res. No. 14-0158) | Communication | Subject: (Direct Referral) Communication from the Commissioner of Public Works submitting bid results on Contract 07-14 (K4-007), 2014 CDBG Concrete Reconstruct. (Res. No. 14-0158)
Recommendation of the Public Works and Services Committee on 04-08-14: That Contract 07-14 (K4-007), 2014 CDBG Concrete Reconstruct, be awarded to A.W. Oakes & Son, Inc., Racine, WI, at their bid price of $2,079,411.05, they being the lowest bidder.
Fiscal Note: Funding to defray the cost of this public works project be appropriated from the following accounts:
$ 404,018.29 - Account 893.030.5520, CDBG Concrete Paving
$ 19,095.45 - Account 893.030.5540, CDBG Concrete Paving
$ 455,546.12- Account 994.908.5020, Concrete Pavement Repl. Misc.
$ 128,217.00 - Account 104.994.5420, Storm Sewers, Misc.
$ 39,249.19 - Account 287.994.5310, Sanitary Sewers, Var. Loc.
$ 5,285.00 - Account 994.600.5010, Traffic Signal Replacements
$ 5,000.00 - Account 993.908.5210, Asphalt Street Paving
$ 3,000.00 - Account 993.908.5230, Alley Resurfacing Asphalt
$ 20,000. | Recommended For Approval | |
Action details
|
Not available
|
14-9991
| A | 5. | Bid results on Contract 08-14 (K4-008), 2014 Traffic Signal & Street Light Replacement - Mt. Pleasant St. & South St. (R1). (Res. No. 14-0159) | Communication | Subject: (Direct Referral) Communication from the Commissioner of Public Works submitting bid results on Contract 08-14 (K4-008), 2014 Traffic Signal & Street Light Replacement - Mt. Pleasant St. & South St. (R1). (Res. No. 14-0159)
Recommendation of the Public Works and Services Committee on 04-08-14: That Contract 08-14 (K4-008), 2014 Traffic Signal & Street Light Replacement - Mt. Pleasant St. & South St. (R1), be awarded to Outdoor Lighting Construction Company, Milwaukee, WI, at their bid price of $297,362.39, they being the lowest responsible bidder.
Fiscal Note: Funding to defray the cost of this public works project be appropriated from the following accounts:
$ 8,491.23 - Account 993.600.5010, Traffic Signal Replacement
$ 46,857.82 - Account 993.590.5010, Street Lighting (2013)
$117,874.41 - Account 994.600.5010, Traffic Signal Replacement
$124,138.93 - Account 994.590.5010, Replace City Circuits
$297,362.39 - Total | Recommended For Approval | |
Action details
|
Not available
|
14-10010
| A | 6. | Final payment on Contract 55-13 (K3-060) Repair HVAC Equipment - Safety Building and City Hall, Johnson Controls, Inc. (Res. No. 14-0160) | Communication | Subject: (Direct Referral) Communication from the Commissioner of Public Works submitting a request for final payment on Contract 55-13 (K3-060) Repair HVAC Equipment - Safety Building and City Hall, Johnson Controls, Inc., contractor. (Res. No. 14-0160)
Recommendation of the Public Works and Services Committee on 04-08-14: That the work done by Johnson Controls, Inc., under Contract 55-13 (K3-060) Repair HVAC Equipment - Safety Building and City Hall, be accepted and final payment authorized for a total contract amount of $50,760.00.
Fiscal Note: Contract was authorized under Resolution No. 13-0330, dated August 20, 2013. | Recommended For Approval | |
Action details
|
Not available
|
14-10006
| A | 7. | Communication from the Assistant Commissioner of Public Works/Operations requesting to waive formal bidding for the City lock and key system. (Res. No. 14-0161) | Communication | Subject: (Direct Referral) Communication from the Assistant Commissioner of Public Works/Operations requesting to waive formal bidding for the City lock and key system. (Res. No. 14-0161)
Recommendation of the Public Works and Services Committee on 04-08-14: The the request of the Purchasing Agent to waive formal bidding procedures be approved in accordance with State Statutes that allow for the waiving of public bids for the purpose of maintaining uniformity of equipment and services.
Further recommends that the Mayor and City Clerk be authorized and directed to enter into an agreement with Apex Key and Lock for the City's lock and key system.
Fiscal Note: N/A | Recommended For Approval | |
Action details
|
Not available
|
14-9985
| A | 8. | Amendment No. 2 to State Project ID: 2350-00-00, Hamilton Street/Douglas Avenue - Main Street to Goold Avenue (K2-011), Graef-USA Inc., consultant. (Res. No. 14-0162) | Communication | Subject: (Direct Referral) Communication from the Assistant Commissioner of Public Works/City Engineer submitting Amendment No. 2 to State Project ID: 2350-00-00, Hamilton Street/Douglas Avenue - Main Street to Goold Avenue (K2-011), Graef-USA Inc., consultant. (Res. No. 14-0162)
Recommendation of the Public Works and Services Committee on 04-08-14: That Amendment No. 2 to State Project ID: 2350-00-00, Hamilton Street/Douglas Avenue (STH 32) - Main Street to Goold Street, Graef-USA, Inc., consultant, as submitted, be approved in the amount of $50,827.48, with the City's share being $12,706.87.
Further recommends that funding to defray the cost of the City's share be appropriated from Account 994.908.5180, Douglas - Main to Goold.
Fiscal Note: Funds are available as herein delineated. | Recommended For Approval | |
Action details
|
Not available
|
14-10011
| A | 9. | Three-Party Design Engineering Services Contract between the City of Racine, State of Wisconsin and Strand Associates, Inc. for Project ID: 2440-09-00 - Washington Avenue (STH 20) - Roosevelt Avenue - West Boulevard. (Res. No. 14-0163) | Communication | Subject: (Direct Referral) Communication from the Assistant Commissioner of Public Works/Operations submitting a Three-Party Design Engineering Services Contract between the City of Racine, State of Wisconsin and Strand Associates, Inc. for Project ID: 2440-09-00 - Washington Avenue (STH 20) - Roosevelt Avenue - West Boulevard. (Res. No. 14-0163)
Recommendation of the Public Works and Services Committee on 04-08-14: That the Mayor and City Clerk be authorized and directed to enter into a three-party agreement with the State of Wisconsin and Strand Associates, Inc., for professional design engineering services for the reconstruction of Washington Avenue (STH 20) from Roosevelt Avenue to West Boulevard, State Project ID: 2440-09-00, for the not-to-exceed cost of $1,598,977.37, with the City's share being $399,744.30 or 25%, and the State's share being $1,199,233.07 or 75%.
Further recommends that funds to defray the cost of these professional services are available in the 2015 CIP.
Fiscal Note: Funds are available as herein delineated. | Recommended For Approval | |
Action details
|
Not available
|
|