Ricine Banner
Meeting Name: Public Works and Services Committee Agenda status: Revised
Meeting date/time: 9/25/2012 5:30 PM Minutes status: Final  
Meeting location: City Hall, Room 301
Revised Agenda
Published agenda: Agenda Agenda Published minutes: Minutes Minutes  
Meeting video:  
Attachments:
File #Ver.Agenda #NameTypeTitleActionResultAction DetailsVideo
12-8161 A1.McKinley Middle School request to close off the south sidewalk of Rupert Boulevard from Chicago Street west to the cemetery during the 2012-2013 winter.CommunicationSubject: Communication from Cheri Kulland, McKinley Middle School Directing Principal, requesting to close off the south sidewalk of Rupert Boulevard from Chicago Street west to the cemetery during the 2012-2013 winter. Recommendation of the Public Works and Services Committee on 9-25-12: That the request be denied and the communication be recieved and filed. Fiscal Note: N/ARecommended to be Received and Filed  Action details Not available
12-8165 A2.Racine Yacht Club request to use the Rooney Recreational Area open space on a temporary basis in case a portion of the space is needed to facilitate the upcoming dredging operation. (RES No. 12-3349)CommunicationSubject: Communication from Charlie Manning, Commodore, Racine Yacht Club, requesting permission to use the Rooney Recreational Area open space on a temporary basis in case a portion of the space is needed to facilitate the upcoming dredging operation. (RES No. 12-3349) Recommendation of the Public Works and Services Committee on 9-25-12: That the Mayor and City Clerk be authorized and directed to enter into a License to Use Real Estate Agreement with the Racine Yacht Club granting them permission to use the Rooney Recreational Area open space on a temporary basis in case a portion of the space is needed to facility the upcoming dredging with the following stipulations: A. A Hold Harmless Agreement be executed and a $62.50 processing fee paid; B. A Liability Insurance Certificate be filed; C. Racine Yacht Club provides environmental documentation that the materials are non-hazardous; D. They provide documentation that the project has been approved by the Wisconsin Department of Natural Resources; and E. All materials be removed from the site by October 31, 2013, with the caRecommended For Approval  Action details Not available
12-8173 A3.Resolution 12-3329, created September 18, 2012, relating to bituminous concrete paving on Victorian Drive from Emstan Hills Road to Maryland Avenue.CommunicationSubject: Resolution 12-3329, created September 18, 2012, relating to bituminous concrete paving on Victorian Drive from Emstan Hills Road to Maryland Avenue. Recommendation of the Public Works and Services Committee on 9-25-12: That Resolution No. 12-3329, created September 18, 2012, be adopted. Fiscal Note: Funds will be appropriated in the 2013 C.I.P. for these street improvements and special assessments will be paid by the abutting property owners for the improvements.Recommended For Approval  Action details Not available
12-8184 A4.Change Order No. 2 to Contract 02-12 (K2-002), 2012 Sidewalk Replacement, Phase I, AZAR LLC., contractor. (RES No. 12-3350)CommunicationSubject: (Direct Referral) Communication from the Assistant Commissioner of Public Works/City Engineer submitting Change Order No. 2 to Contract 02-12 (K2-002), 2012 Sidewalk Replacement, Phase I, AZAR LLC., contractor. (RES No. 12-3350) Recommendation of the Public Works and Services Committee on 9-25-12: That Change Order No. 2 on Contract 2-12 (K2-002), 2012 Sidewalk Replacement, Phase I, AZAR LLC, contractor, be approved in the amount of $1,091.17. Fiscal Note: Funding to defray the cost of this change order be appropriated from Account 906.000.5520, Sidewalk Replacement.Recommended For Approval  Action details Not available
12-8185 A5.Final payment to Contract 02-12 (K2-002) 2012 Sidewalk Replacement, Phase I, AZAR LLC., contractor. (RES No. 12-3351)CommunicationSubject: Communication from the Commissioner of Public Works submitting final payment to Contract 02-12 (K2-002) 2012 Sidewalk Replacement, Phase I, AZAR LLC., contractor. (RES No. 12-3351) Recommendation of the Public Works and Services Committee on 9-25-12: That the work done by AZAR LLC under Contract 2-12 (K2-002), 2012 Sidewalk Replacement, Phase I, be accepted and final payment authorized for a total contract amount of $308,838.85. Fiscal Note: Contract was authorized under Resolution No. 12-3023, dated March 20, 2012.Recommended For Approval  Action details Not available
12-8148 A6.Final payment on Contract 20-12 (K2-021) - PS - 2012 Bridge Inspection Services, Ayres Associates, Consultant. (RES No. 12-3352)CommunicationSubject: (Direct Referral) Communication from the Commissioner of Public Works submitting final payment on Contract 20-12 (K2-021) - PS - 2012 Bridge Inspection Services, Ayres Associates, Consultant. (RES No. 12-3352) Recommendation of the Public Works and Services Committee on 9-25-12: That the professional services provided by Ayres Associates, under Contract 20-12 (K2-021, Professional Services - 2012 Bridge Inspection Services, be accepted and final payment authorized for a total contract amount of $18,841.61. Fiscal Note: Contract was authorized under Resolution No. 12-7288, dated January 19, 2012.Recommended For Approval  Action details Not available
12-8172 A7.Change Order No. 3 to Contract 22-12 (K2-023), Safety Building-Replace Ceiling and Lights, Absolute Construction Company, contractor. (RES No. 12-3353)CommunicationSubject: (Direct Referral) Communication from the Assistant Commissioner of Public Works/Operations submitting Change Order No. 3 to Contract 22-12 (K2-023), Safety Building-Replace Ceiling and Lights, Absolute Construction Company, contractor. (RES No. 12-3353) Recommendation of the Public Works and Services Committee on 9-25-12: That Change Order No. 3 on Contract 22-12 (K2-023), Safety Building Ceiling and Lights, Absolute Construction Enterprises, Inc., contractor, be approved in the amount of $10,447.00. Fiscal Note: Funding to defray the cost of this change order be appropriated from Account 991.210.5040, Safety Building - Building Updates.Recommended For Approval  Action details Not available
12-8170 A8.Change Order No. 1 on Contract 38-12 (K2-043) Sewer and Lateral Lining, Musson Brothers, contractor. (RES No. 12-3354)CommunicationSubject: (Direct Referral) Communication from the Assistant Commissioner of Public Works/City Engineer submitting Change Order No. 1 on Contract 38-12 (K2-043) Sewer and Lateral Lining, Musson Brothers, contractor. (RES No. 12-3354) Recommendation of the Public Works and Services Committee on 9-25-12: That Change Order No. 1 on Contract 38-12 (K2-043), Sewer & Lateral Lining, Musson Brothers, Inc., contractor, as submitted, be approved that will provide a time extension until October 19, 2012 to complete this contract. Fiscal Note: There will be no change in contract price as a result of this change order.Recommended For Approval  Action details Not available
12-8152 A9.Amendment No. 2 to an existing agreement for the marking of underground street lighting and traffic signal infrastructure with Precise Underground Marking Corporation, Milwaukee, WI. (RES No. 12-3355)CommunicationSubject: (Direct Referral) Communication from the Assistant Commissioner of Public Works/City Engineering submitting Amendment No. 2 to an existing agreement for the marking of underground street lighting and traffic signal infrastructure with Precise Underground Marking Corporation, Milwaukee, WI. (RES No. 12-3355) Recommendation of the Public Works and Services Committee on 9-25-12: That the agreement with Precise Underground Marking Corporation to mark underground street lighting and traffic signal infrastructure, which ends December 31, 2012, be approved for a one (1) year extension with a per ticket price of: Prescreens - $9.27; Locates - $11.85; Site Visit/No Conflict - $11.85; Emergency During Business Hours (Clear/No Conflict/Site Visit/Locate) - $11.85; Emergency After Business Hours (Clear/No Conflict/Site Visit/Locate) - $41.20; Projects - $25.75 per hour. Fiscal Note: Funding to defray the cost of these services is available in Account 101.590.5610, Street Lighting-Professional Services.Recommended For Approval  Action details Not available
12-8164 A10.Assessment rates established for 2013 Public Hearings for 2014 construction of Portland Cement Concrete Paving and Curb and Gutter. (RES No. 12-3356)CommunicationSubject: (Direct Referral) Communication from the Assistant Commissioner of Public Works/City Engineer submitting the assessment rates established for 2013 Public Hearings for 2014 construction of Portland Cement Concrete Paving and Curb and Gutter. (Res. No. 12-3356) Recommendation of the Public Works and Services Committee on 9-25-12: The proposed special assessment rates for public hearings in 2013 (2014 construction) for portland cement concrete paving and curb and gutter be as follows: Portland Cement Concrete Paving Residential Paving (7 inch) - 26' Flange to Flange $57.00/Front Foot Residential Paving (7 inch) - 30' Flange to Flange $62.00/Front Foot Residential Paving (7 inch) - 32' Flange to Flange $65.00/Front Foot Commercial Paving (8 inch) - 32' Flange to Flange $75.00/Front Foot Industrial Paving (9 inch) - 32' Flange to Flange $85.00/Front Foot Industrial Paving (9 inch) - 42' Flange to Flange $100.00/Front Foot Industrial Paving (9 inch doweled)-44' Flange to Flange $115.00/Front Foot Industrial Paving (10 inch doweled)-44' Flange to Flange Recommended For Approval  Action details Not available